Image

Lost Lake Trail Upgrade

In 2021, FOSS applied for, and received, a grant for $10,000 from The Central Okanagan Foundation to upgrade Lost Lake Trail. The trail was overgrown, suffered from significant erosion, and had ongoing water issues. First, the trail was cleared and brushed to better define the trail itself. Approximately 4.5K of the trail was regraded by excavator to allow water to
Image

Bridge Relocation, Priest Creek

In 2017, 2 bridges in Priest Creek Linear Park became nonfunctional when the creek relocated during extensive flooding in the area. The bridges were high quality, backcountry bridges with 10 inch steel I-beam construction and were located in a cedar forest with 100 foot canopy. FOSS was contracted by BC Parks to relocate these bridges and work commenced in Spring
Image

Lost Lake Trail Upgrade

In 2021, FOSS applied for, and received, a grant for $10,000 from The Central Okanagan Foundation to upgrade Lost Lake Trail. The trail was overgrown, suffered from significant erosion, and had ongoing water issues. First, the trail was cleared and brushed to better define the trail itself. Approximately 4.5K of the trail was regraded by excavator to allow water to
Image

Bridge Relocation, Priest Creek

In 2017, 2 bridges in Priest Creek Linear Park became nonfunctional when the creek relocated during extensive flooding in the area. The bridges were high quality, backcountry bridges with 10 inch steel I-beam construction and were located in a cedar forest with 100 foot canopy. FOSS was contracted by BC Parks to relocate these bridges and work commenced in Spring
Image

Lost Lake Trail Upgrade

In 2021, FOSS applied for, and received, a grant for $10,000 from The Central Okanagan Foundation to upgrade Lost Lake Trail. The trail was overgrown, suffered from significant erosion, and had ongoing water issues. First, the trail was cleared and brushed to better define the trail itself. Approximately 4.5K of the trail was regraded by excavator to allow water to
Image

Bridge Relocation, Priest Creek

In 2017, 2 bridges in Priest Creek Linear Park became nonfunctional when the creek relocated during extensive flooding in the area. The bridges were high quality, backcountry bridges with 10 inch steel I-beam construction and were located in a cedar forest with 100 foot canopy. FOSS was contracted by BC Parks to relocate these bridges and work commenced in Spring