In 2021, FOSS applied for, and received, a grant for $10,000 from The Central Okanagan Foundation to upgrade Lost Lake Trail. The trail was overgrown, suffered from significant erosion, and had ongoing water issues.
First, the trail was cleared and brushed to better define the trail itself. Approximately 4.5K of the trail was regraded by excavator to allow water to shed from the trail with a minimum of erosion. Then, a new culvert and hand ditching was completed in addition to the excavator work.
The majority of the work was completed in Fall 2021. In Summer 2022, the trail above Bellevue Access was completed when the water had subsided in the upper sections of the trail.